Ba | Industrial Fabrication Shop

Industrial Fabrication Shop

Vineland, New Jersey
Addition + Alteration
15,400 SF

This Client has a 3rd generation sheet metal fabrication shop where as there present location was established in 1968.  As the company continues to grow and diversify their trade, their facility needs to accommodate additional equipment and a larger stock of materials.

Ba evaluated the existing building’s structural makeup and overall floor layout including the production circulation flows.  Ba worked closely with the Client to understand the scope of the existing and proposed equipment, along with all of the OSHA code compliant regulations.

Ba established for the Client program needs that include: larger support offices with more efficient work stations, an employee break room, updated bathrooms with showers, and organized storage for both materials as well as their retail line of both hand and power tools.